Skip to content
← Evidence archive

Public evidence summary

Six-hour encrypted checkpoint rerun completed

Record date
19 September 2026
Scope
Historical evidence; the scope and environment are described in the recorded result.
Current deployment
Not independently verified by this historical evidence. Current availability

Recorded result

From 18 to 19 September 2026, one hosted six-hour segment completed all 72 checkpoints after the earlier deadline defect was corrected. Six recorded assertions passed, covering the segment duration, checkpoint count, cadence, bounded memory and absence of checkpoint failures, plus a control against pooling unrelated runs. This rerun used one guest size on one host. It does not turn the earlier failed run into a pass or establish reliability for larger guests, other workloads or the current deployment.