Encrypted checkpoint soak: one checkpoint missed
- Record date
- 2026-09-08
- Scope
- Historical evidence; the scope and environment are described in the recorded result.
- Current deployment
- Not independently verified by this historical evidence. Current availability
Recorded result
The run completed in September 2026 and was sealed as failed on 8 September. On the encrypted hosted configuration, a six-hour segment restored its hours-old state and stayed within the other measured durability limits, but only 71 of 72 checkpoints completed because one snapshot exceeded its deadline. The record therefore remains failed. A later amendment points to a successful rerun completed on 19 September; that result belongs to the separate rerun and does not erase this defect or its original outcome.
The public summary as JSON. These are the same reviewed fields shown in Read.
{
"schemaVersion": 1,
"publicSummaryVersion": "2026-09-30",
"classification": "PUBLIC",
"title": "Encrypted checkpoint soak: one checkpoint missed",
"summary": "The run completed in September 2026 and was sealed as failed on 8 September. On the encrypted hosted configuration, a six-hour segment restored its hours-old state and stayed within the other measured durability limits, but only 71 of 72 checkpoints completed because one snapshot exceeded its deadline. The record therefore remains failed. A later amendment points to a successful rerun completed on 19 September; that result belongs to the separate rerun and does not erase this defect or its original outcome.",
"date": "2026-09-08",
"scope": "Historical evidence; the scope and environment are described in the recorded result.",
"result": "The run completed in September 2026 and was sealed as failed on 8 September. On the encrypted hosted configuration, a six-hour segment restored its hours-old state and stayed within the other measured durability limits, but only 71 of 72 checkpoints completed because one snapshot exceeded its deadline. The record therefore remains failed. A later amendment points to a successful rerun completed on 19 September; that result belongs to the separate rerun and does not erase this defect or its original outcome.",
"sections": [],
"currentDeployment": "Not independently verified by this historical evidence.",
"canonical": "/evidence/phase-soak-3"
}
Download this public summary
This derivative has its own digest. It is not the original transcript or a new test. Historical original records are preserved privately.
Download public JSON →SHA-256 48b945792f6afc7ef2d862c55ba75626a8f8c8ae612ee93916bd4dded01a65f4