Public evidence summary
Billing state across a real host loss
- Record date
- 6 September 2026
- Scope
- Historical record; any production observation is limited to the dated test described below.
- Current deployment
- Not independently verified by this historical evidence. Current availability
Recorded result
The record combines a hosted failover rehearsal dated 6 September 2026 and production enablement dated 7 September. Six assertions report billing continuity after real host deallocation: recorded spend survived, an identical retry was not billed again, and budget enforcement used the carried balance. Settlement stayed blocked until reconciliation passed. One run measured 47 seconds from deallocation to reconciliation; this is not an availability promise. The enablement addendum records a live production check. Session recovery relied on a separately tested mechanism, and regional disaster recovery was not established.
The public summary as JSON. These are the same reviewed fields shown in Read.
{
"schemaVersion": 1,
"publicSummaryVersion": "2026-09-30",
"classification": "PUBLIC",
"title": "Billing state across a real host loss",
"summary": "The record combines a hosted failover rehearsal dated 6 September 2026 and production enablement dated 7 September. Six assertions report billing continuity after real host deallocation: recorded spend survived, an identical retry was not billed again, and budget enforcement used the carried balance. Settlement stayed blocked until reconciliation passed. One run measured 47 seconds from deallocation to reconciliation; this is not an availability promise. The enablement addendum records a live production check. Session recovery relied on a separately tested mechanism, and regional disaster recovery was not established.",
"date": "6 September 2026",
"scope": "Historical record; any production observation is limited to the dated test described below.",
"result": "The record combines a hosted failover rehearsal dated 6 September 2026 and production enablement dated 7 September. Six assertions report billing continuity after real host deallocation: recorded spend survived, an identical retry was not billed again, and budget enforcement used the carried balance. Settlement stayed blocked until reconciliation passed. One run measured 47 seconds from deallocation to reconciliation; this is not an availability promise. The enablement addendum records a live production check. Session recovery relied on a separately tested mechanism, and regional disaster recovery was not established.",
"sections": [],
"currentDeployment": "Not independently verified by this historical evidence.",
"canonical": "/evidence/phase-fo-1b"
}
Download this public summary
This derivative has its own digest. It is not the original transcript or a new test. Historical original records are preserved privately.
Download public JSON →SHA-256 475d5224a72c13083a0cf78861dca169389264720ee75a880fff60579275dbcd