Skip to content
← Evidence archive

Public evidence summary

Retry from the saved state within the approved spending limit

Record date
16 September 2026
Scope
Historical record; any production observation is limited to the dated test described below.
Current deployment
Not independently verified by this historical evidence. Current availability

Recorded result

On 16 September 2026, a laboratory fixture completed a three-step job after two failed attempts. Each retry started from the same saved state. The test refused an unsupported model choice, stopped when the remaining budget could not cover another attempt, and made no retry after the final attempt. A negative control detected a disabled budget check. These are fixture results, not measured production costs or a savings guarantee.