Public evidence summary
Historical credit-ledger and funds-interlock test
- Record date
- 31 August 2026
- Scope
- Historical record; any production observation is limited to the dated test described below.
- Current deployment
- Not independently verified by this historical evidence. Current availability
Recorded result
On 31 August 2026, a hosted-hardware test with a real virtual-machine session verified that repeated credit operations did not duplicate a debit and that exhaustion checkpointed and parked the session, which later resumed after a top-up. A 17 September amendment changed the test because customers were no longer allowed to invoke credit-changing operations. The amended ledger checks run in isolation, with settlement supported by separate evidence. The original assertions describe the earlier interface; they are not proof that those customer operations remain available or that the amended test reran in production.
The public summary as JSON. These are the same reviewed fields shown in Read.
{
"schemaVersion": 1,
"publicSummaryVersion": "2026-09-30",
"classification": "PUBLIC",
"title": "Historical credit-ledger and funds-interlock test",
"summary": "On 31 August 2026, a hosted-hardware test with a real virtual-machine session verified that repeated credit operations did not duplicate a debit and that exhaustion checkpointed and parked the session, which later resumed after a top-up. A 17 September amendment changed the test because customers were no longer allowed to invoke credit-changing operations. The amended ledger checks run in isolation, with settlement supported by separate evidence. The original assertions describe the earlier interface; they are not proof that those customer operations remain available or that the amended test reran in production.",
"date": "31 August 2026",
"scope": "Historical record; any production observation is limited to the dated test described below.",
"result": "On 31 August 2026, a hosted-hardware test with a real virtual-machine session verified that repeated credit operations did not duplicate a debit and that exhaustion checkpointed and parked the session, which later resumed after a top-up. A 17 September amendment changed the test because customers were no longer allowed to invoke credit-changing operations. The amended ledger checks run in isolation, with settlement supported by separate evidence. The original assertions describe the earlier interface; they are not proof that those customer operations remain available or that the amended test reran in production.",
"sections": [],
"currentDeployment": "Not independently verified by this historical evidence.",
"canonical": "/evidence/phase-cp-c2"
}
Download this public summary
This derivative has its own digest. It is not the original transcript or a new test. Historical original records are preserved privately.
Download public JSON →SHA-256 9990196fe693c08a2324dac00162105a71c993f17d25e1d8c5d445325da30361